A. SAND COMPACTION PILE
I.
SUMMARY:
1) Principle
-
This construction method is to improve soft soil ground by forming a large diameter sand column by  injecting sand into the soft ground using vibration and impact load.
-  If performed simultaneously with the load banking method, the initial banking height will be increased andconstruction period will be decreased. While sandy soil is compacted by vibration, replica rolex swiss watches in uk
clayey soil is transformed into synthetic ground with largediameter sand piles and its stability can be guaranteed.

2) Application
    This method can be applied to almost every types of soil condition such as the foundation of tanks, sandysoil, clayey soil, reclamation site, harbor facilities, foundation of waste water treatment facilities and sedimentary soil layer. It is because one SCP apparatus can change its positions freely and install sand piles even at the places where structures are very heavy or very large, where construction time must be reduced absolutely or where even stronger and securer improvement is needed.

 

II. CHARACTERISTICS:

1) Sand
-
  Prevention of liquefaction caused by earthquake and vibration
-  Increase of horizontal load capacity (Increase of shear strength)
-  Decrease of compressive settlement
-  Ground homogenization in terms of compaction

2) Clay
-  Increase of shear strength by forming synthetic ground
-  Prevention of sliding failure and increase of bearing capacity
-  Reduction of time and quantity of consolidation (drainage effect)
-  Residual settlement is stabilized in a very short time.
-  Prevention of uneven settlement

III. CONSTRUCTION METHOD AND SEQUENCE

Mark the target position with red cloth by means of surveying.
  - After operating a vibro-hammer, start to penetrate the casing while monitoring current and depth.
  - Suspend penetration when the depth reaches the design value.

Open the valve to decrease the inner pressure of the casing and then pore sand into the casing.

Pull out the casing confirming that depth gauge of the sand surface drops.
  - When the sand surface depth inside the casing becomes 1.5 meter or so, suspend the penetration.
  - Penetrate the casing to the specified depth confirming the sand surface depth. (Discharging sand by compressive air).

Close the quick discharge valve and open the inner pressure valve. Then re-penetrate the casing to the specified depth.

Repeat  step to .

When the depth gauge approaches around one meter form the ground surface, close the inner pressure valve and suspend the air jet.

Pull out the casing with the quick discharge valve opened until the casing tip is separated completely from the ground surface.

Move the other construction position.

Marine Crane Barge 150 TON Hydraulic Hammer 16 TON
Hydraulic Hammer 13 TON
Vibration Hammer 120 KW Vibration Hammer 150KW
Crawler Crane 80 TON PayLoader (Bucket = 2.6m3)
GENERATOR (500KW, 350KW, 150KW, 75KW)

ChoSuk Construction & Development Co., Ltd is invested 100% foreign capital of Korea in Vietnam, being in charge of soil and foundation construction, pile driving which is the most important field in construction works.

ChoSuk company established on the first time with investment certificate no 461043000524 issued by HCM people committee on 26/11/2007 and the second changing certificate no 461043000524 on 20/02/2009 issued by Binh Duong people committee. Our company business fields include: construct the civil work, industrial and traffic, for rent construction machine, equipment (not include financial lease), job training to serve construction field.

Our company established near two year, We have experiences in construction field of Korean and experienced and strong team that had joined of foreigner contractor. Our company have done and are implementing large projects with foreigner contractors such as: POSCO Engineering & Construction Co., Ltd, POSCO E & C SAMWHAN Joint Venture, POSILAMA E & C Co., Ltd, GS Engineering & Construction Corp...

By this brochure, we hope that you will get userful and necessary information about our company.omega watches sale
With our efforts, we always create construction quality and service quality as requestment of the works. We are very pleased to receive trust, support, cooperation from contractors of Vietnam and foreign.

Best regards,
General Director
CHOI KYUN - YONG

 

Company’s Information: CHOSUK Contruction & Development Co., Ltd.
Abbreviate name: CHOSUK C & D.
Head Address: Uyen Hung Town, Tan Uyen District, Binh Duong Province.
Representative office: 70 Pham Ngoc Thach street, Ward 6, rolex replica District 3, HCMC.
Legal capital: 3.500.000USD (Three million five hundred thousand dollars).
Total investment capital first time: 5.000.000USD (Five million US dollars).
second time: 10.000.000USD (Ten million dollars).
Investment certificate no: 461043000524.
Tax Registration Certificate no: 0305342907.
Telephone number: 08.38205745 / 747.
Fax no: 08.38205746.
Email:  Omega replica watches
Company’s Business fields: Construct civil works, industrial and trafic; For rent construction machinery, equipment (not include operations of financial lease); Job training center to serve for construction field.



번호 제목 조회 수 글쓴이
45 KPF file 15058 kimswed
44 보민건설베트남 file 15940 kimswed
43 대한전선 베트남 file 15415 kimswed
42 Hanwha file 13096 kimswed
41 DIOS TECH file 12757 kimswed
40 YOUNGPOONG file 12687 kimswed
39 POONGIN 13533 kimswed
38 YAKJIN Trading 13132 kimswed
37 www.longhau.com.vn file 12796 kimswed
36 CJ file 12877 kimswed
35 JUNA STEEL file 12858 kimswed
34 NMS Vietnam file 12927 kimswed
33 POSCO file 14669 kimswed
32 HAPPY COOK file 2524 kimswed
31 PHOENIX GOLF file 435 kimswed
30 SK file 1761 kimswed
29 NANUX file 1484 kimswed
28 DARBY-CJ file 2166 kimswed
» CHOSUK건설 file 45905 kimswed
26 sky lake golfclub file 2332 kimswed